Completion Ceremony of Van Hoa Bridge over Gianh river and approach embankments at Van Hoa Village, Tuyen Hoa District, Quang Binh Province

Thursday - 29/11/2018 06:09
On Friday, August 30th, 2013, leaders' representatives of Quang Binh Department of Transportation organized the ceremony of completion of Van Hoa Bridge over Gianh river and approach embankments at Van Hoa Village, Tuyen Hoa District, Quang Binh Province
Completion Ceremony of Van Hoa Bridge over Gianh river and approach embankments at Van Hoa Village, Tuyen Hoa District, Quang Binh Province

 

At the ceremony, many attendants who are leaders' representatives of Leader Party, Quang Binh People Committee, Permanent Steering Committee such as Mr Luong Ngoc Binh, Commissioner of the Party Central Committee - Secretary - Chairman of the provincial People's Council, Mr Nguyen Huu Hoai -  Deputy Secretary - Chairman of the Quang Binh provincial People's Committee​​ as well as includes leaders of Related Department, Units, Contractors and numerous local residents.

Construction project of Van Hoa Bridge and approach embankments which have total capital investment is 413.646 million with total length is 3.955m, connecting the 12A Highway at Km17+298 and Song Danh Quang Phuc Cement Manufacture at Ha Trung Commune, Van Hoa Village

In this project, total length is 1.034m, including 2 bridges. One is the bidge over Gianh river which has 755,8m in length and span layout is 5x18+(39.15+4x40)+(48+72+48)+(4x40+39.15)+5x18 and remaind one is railway overpass has 277.2m in length and span layout is 27+7x30+27(m). All are built with permanent reinforced concrete and pre-stressed  reinforced concrete​ structures. The approach embankments has 2.922m in length that include two parts. The road at Km0+00-Km3+534.6 is 12m in length and at Km3+534.6 - km3+955.3 is 21m

The construction works were started on 07/1/2011 and completed after 32 months of construction. At this time, most of works have been completed and get acceptance of satisfactory quality , arts in accordance with approved designs and technical instructions of the project .

During implementing process, despite of a number of difficulties which the company was faced due to economic recession, public spending cuts, but thanks to the efforts of the authorities and relevant agencies, the closing coordination between the Department of transportation and consultants, contractors, suppervisers, the helpful directs of Party and local government, the projects has been completed  then handover to the Employer to use on Vietnamese National Day 02/09/2013 
 

Mr Hoang Tung Vuong (the second person from the left)  -RCC representative received the complementary

of Quang Binh provicial People Committee  

Mr Ngo Khac Hoanh (the first person from the right)  - Vice manager of RCC technology department, one of project steering commitee received the complementary

of Quang Binh provicial People Committee  

Mr Nguyen Thanh Long ( the first person from the left) - Constractors' representative cut  ribbon to annouce the ceremony of project completion  

 

Van Hoa Bridge over Gianh river

 

The completion of  Van Hoa Bridge and communal roads which connected Quang Trach village and Van Hoa village that satisfied local people's travel needs as well as to meet social - economic development, to ensure safety and rescue for local residents at villages locating at south of Gianh river when storms and flooding may happen. The  project also creates better conditions to explore potential mining development such as construction material, particularly cement industry .

Total notes of this article: 0 in 0 rating

Click on stars to rate this article

  Reader Comments

Động thổ gói thầu CP3C Dự án Nâng cao an toàn cầu trên tuyến đường sắt Hà Nội – Thành phố Hồ Chí Minh
Khánh thành cầu vượt km982+981 thi công theo lệnh khẩn cấp
Khánh thành cầu Văn Hóa vượt sông Gianh
Tổ chức Ngày hội Văn hóa Thể thao lần thứ IV - năm 2013
Thông xe cầu đường bộ Thị Cầu
Thông xe cầu đường bộ Đồng Nai
Thi công cầu Nhật Lệ 2 - Quảng Bình bằng công nghệ dây văng
Thông xe kỹ thuật cầu đường bộ Bạch Hổ qua sông Hương - TP Huế
Phát động thi đua đẩy nhanh tiến độ thi công cầu Thị Cầu
Thủ tướng Nguyễn Tấn Dũng thăm cầu đường bộ Bạch Hổ qua Sông Hương - TP Huế
Statistics
  • Online9
  • Today3,233
  • This month93,525
  • Total2,119,875
You did not use the site, Click here to remain logged. Timeout: 60 second