Construction of railway overbridge, road overbridge, bridge crossing river, slab bridge and road at two bridge ends of Dong Hoi City bypass 1A National Highway Construction Project

Thursday - 29/11/2018 06:17
Construction of railway overbridge, road overbridge, bridge crossing river, slab bridge and road at two bridge ends of Dong Hoi City bypass 1A National Highway Construction Project

+ Scale and technical characteristics of the works: The bridge with length 20.38m-211,55m, include many spans length 12-33m, bored cast-in-place pile L=13-36m, reinforced concrete pile 35x35 L=8-16m, structure of beams span I=33m, plate girder 12m, box girder 18m, T-girder 24m-33m. The road at two  bridge ends  with weak soil  handled by sand pile and vertical artificial drain.

+ Works value:  80.874 billion VND

+Year of commencement: 2006

+Year of  completion: 2008

+ Employer/ Representative Employer: BOT Ltd Company – Dong Hoi bypass. Address: No.50, Nguyen Huu Canh road, Dong Hoi city, Quang Binh province.


Total notes of this article: 0 in 0 rating

Click on stars to rate this article

  Reader Comments

Động thổ gói thầu CP3C Dự án Nâng cao an toàn cầu trên tuyến đường sắt Hà Nội – Thành phố Hồ Chí Minh
Khánh thành cầu vượt km982+981 thi công theo lệnh khẩn cấp
Khánh thành cầu Văn Hóa vượt sông Gianh
Tổ chức Ngày hội Văn hóa Thể thao lần thứ IV - năm 2013
Thông xe cầu đường bộ Thị Cầu
Thông xe cầu đường bộ Đồng Nai
Thi công cầu Nhật Lệ 2 - Quảng Bình bằng công nghệ dây văng
Thông xe kỹ thuật cầu đường bộ Bạch Hổ qua sông Hương - TP Huế
Phát động thi đua đẩy nhanh tiến độ thi công cầu Thị Cầu
Thủ tướng Nguyễn Tấn Dũng thăm cầu đường bộ Bạch Hổ qua Sông Hương - TP Huế
Statistics
  • Online56
  • Today5,559
  • This month134,895
  • Total1,751,908
You did not use the site, Click here to remain logged. Timeout: 60 second