Crossover No. 1,2,3,4 of Sai Gon -Trung Luong Super Highway Project

Thursday - 29/11/2018 06:16
Crossover No. 1,2,3,4 of Sai Gon -Trung Luong Super Highway Project

+ Scale and technical characteristics of the works: the bridge has 6 spans under the circuit 2x30m + 2x25m + 2x30m. Total length: 190,9m. C40 Prestressed reinforced  concrete box beam with depth: 1.45m.  C25 precast reinforced concrete slabs parapet. Abutments in barrier wall shape poured-in-place with body, base, wall, head by C35 reinforced concrete. The foundation by C30 reinforced concrete bored cast-in-place piles.

+ Works value:  83.632 billion VND

+Year of commencement: 2006

+Year of  completion: 2008

+ Employer/ Representative Employer: My Thuan Project Management Unit. Address: No.127 Dinh Tien Hoang, Ward 3, Binh Thanh District, Ho Chi Minh City

 

Total notes of this article: 0 in 0 rating

Click on stars to rate this article

  Reader Comments

Động thổ gói thầu CP3C Dự án Nâng cao an toàn cầu trên tuyến đường sắt Hà Nội – Thành phố Hồ Chí Minh
Khánh thành cầu vượt km982+981 thi công theo lệnh khẩn cấp
Khánh thành cầu Văn Hóa vượt sông Gianh
Tổ chức Ngày hội Văn hóa Thể thao lần thứ IV - năm 2013
Thông xe cầu đường bộ Thị Cầu
Thông xe cầu đường bộ Đồng Nai
Thi công cầu Nhật Lệ 2 - Quảng Bình bằng công nghệ dây văng
Thông xe kỹ thuật cầu đường bộ Bạch Hổ qua sông Hương - TP Huế
Phát động thi đua đẩy nhanh tiến độ thi công cầu Thị Cầu
Thủ tướng Nguyễn Tấn Dũng thăm cầu đường bộ Bạch Hổ qua Sông Hương - TP Huế
Statistics
  • Online242
  • Today15,736
  • This month420,085
  • Total1,243,253
You did not use the site, Click here to remain logged. Timeout: 60 second