+ Scale and technical characteristics of the works:
Bridge length: 241.4m. Span diagram: 7x33m. I-Beam, post-tensioned pre-stressed reinforced conrete. M0, M7 Abutments are in U shape, their foundations are constructed by reinforced concrete piles 45x45cm, with 21 piles for each abutment, expected length 42m. Reinforced concrete pier based on foundation consolidated by reinforced concrete piles 45x45cm with 18-20 piles for each pier.
+ Works value: 145.827 billion VND
+ Year of commencement: 2005.
+ Year of completion: 2009
+ Employer/ Representative Employer: My Thuan Project Management Unit.