17:30 ICT SUNday, 19/09/2021

Works Projects

Home » Works-Projects » Completed Projects and Constructions

Construction of railway overbridge, road overbridge, bridge crossing river, slab bridge and road at two bridge ends of Dong Hoi City bypass 1A National Highway Construction Project

MONday - 28/05/2012 16:56
Construction of railway overbridge, road overbridge, bridge crossing river, slab bridge and road at two bridge ends of Dong Hoi City bypass 1A National Highway Construction Project

Construction of railway overbridge, road overbridge, bridge crossing river, slab bridge and road at two bridge ends of Dong Hoi City bypass 1A National Highway Construction Project

+ Scale and technical characteristics of the works: The bridge with length 20.38m-211,55m, include many spans length 12-33m, bored cast-in-place pile L=13-36m, reinforced concrete pile 35x35 L=8-16m, structure of beams span I=33m, plate girder 12m, box girder 18m, T-girder 24m-33m. The road at two  bridge ends  with weak soil  handled by sand pile and vertical artificial drain.

+ Works value:  80.874 billion VND

+Year of commencement: 2006

+Year of  completion: 2008

+ Employer/ Representative Employer: BOT Ltd Company – Dong Hoi bypass. Address: No.50, Nguyen Huu Canh road, Dong Hoi city, Quang Binh province.


Key: n/a

The latest news

The older news

 

Video